A look into our past projects...
Welder working into the night in preparation for our first haul out.
fitting new steel
Installation of longitudinal bulkhead panel on Manson Construction M73 Barge repair project.
night grinding
Prep for new steel to be installed in Manson M73 Barge
Back in with new steel
Installation of bottom longitudinals on Manson Construction M73 Barge.
Transverse bulkhead install
Welder works to fit in new pre-built transverse bulkhead panel on Manson Construction M73 Barge
Drone footage of a 100'w x 400'l barge under repair for bottom damage due to a grounding incident
Project in our Graving Dock
Composite before & after .. this was actually sister barges that came through our facility for Dockings, but were in identical pre-dock condition.